About The Plant

Generating Reliable Energy for a Sustainable Future

Dhariwal Infrastructure Limited operates a 600 MW (2 × 300 MW) coal-based thermal power generating plant located at Chandrapur, Maharashtra. A wholly owned subsidiary of CESC Limited, the flagship power utility of the RP-Sanjiv Goenka Group, the plant is committed to delivering reliable, efficient and sustainable power through operational excellence, advanced engineering and responsible environmental practices.

Commissioned in 2014, the plant plays an important role in meeting the nation's growing energy demand. With a strong focus on safety, reliability, innovation and sustainability, Dhariwal Infrastructure Limited continues to deliver dependable power while creating long-term value for customers, stakeholders and the communities it serves.

  • The plant is supported by a dedicated water supply system designed to ensure reliable operations throughout the year while promoting efficient water management and conservation.
  • The electricity generated by the plant is supplied to long-term customers and through competitive power markets, contributing to a reliable power supply across India.
  • The plant consistently strives to achieve high operational reliability and efficiency through continuous improvement and best maintenance practices.

Dhariwal Infrastructure Limited maintains internationally recognized management systems for Quality, Environment, Occupational Health & Safety, Energy Management and Information Security, reflecting its commitment to operational excellence and continual improvement.

The plant is certified under:

  • ISO 9001 – Quality Management System
  • ISO 14001 – Environmental Management System
  •  ISO 45001 – Occupational Health & Safety Management System
  • ISO 50001 – Energy Management System
  •  ISO 27001 – Information Security Management System


Plant Information

Particular
Details
Installed Capacity
600 MW (2 × 300 MW)
Plant Type
Coal-Based Thermal Power Plant
Location
Tadali, Chandrapur, Maharashtra, India
Primary Fuel
Domestic Coal
Commercial Operation Date
Unit 1 – 11 February 2014
Unit 2 – 2 August 2014
Grid Connectivity
State Transmission Utility (STU) & Central Transmission Utility (CTU)